Most quality disputes are not caused by a missing inspection. They are caused by an inspection that checks the wrong things. These are the five checkpoints we run before a container is sealed.
1. Incoming material traceability
Every heat number is matched against the mill certificate before the first cut. If the certificate is missing, the batch is quarantined rather than pushed through production.
2. In-process dimensional audit
First articles are measured in full, then a sampled dimensional audit runs every two hours. Critical dimensions are recorded on a control chart so drift is visible before it becomes scrap.
3. Functional test on 100% of units
Pressure hold, leak test and actuation cycle, on every unit, with the result tied to the serial number. Sampling is not acceptable for safety-related components.
4. Packaging and drop test
Export packaging is tested with a drop and vibration run on a sample carton. Cartons that pass visually can still fail after three weeks at sea.
5. Documentation package review
- Packing list and commercial invoice matching the order
- Material certificates and test reports
- Nameplate and marking check against the drawing
- Photographs of the sealed container and seal number
The inspection report should be readable by someone who was not on the factory floor. If it needs a phone call to interpret, it is not finished.
Ask us for a sample inspection report and we will send the template used on your product category.

