Preventive maintenance should follow the machine manufacturer’s manual and the actual operating environment. The following checklist is a planning framework, not a substitute for model-specific instructions or lockout procedures.
Every shift
- Inspect the nozzle, protective window and ceramic body according to the approved procedure.
- Check assist-gas pressure, chiller status and alarm history.
- Remove loose scrap and verify that extraction zones operate correctly.
- Run a short reference cut when quality requirements are critical.
Weekly
- Clean accessible debris without contaminating optical components.
- Inspect lubrication points, covers, cable carriers and pneumatic lines.
- Review filter condition and cooling-system readings.
Monthly and by operating hours
- Check axis condition, exchange-table movement and safety interlocks.
- Replace filters and service auxiliary equipment at specified intervals.
- Trend nozzle, lens and gas consumption to identify gradual process changes.
Record the material, thickness, parameters and operator action alongside each quality issue. A consistent log makes remote diagnosis faster and reduces unnecessary parts replacement.



